District 1 South Report — January 2023

Clippers Intuit Dome – As the steel on the dome is being completed, the NECA contractors will ramp up manpower needed for the project — CSI Electric (lighting and branch circuitry inside the dome). Touchstone will perform the DAS system as well as all the power to each seat. GECTWO will install the first NBA Oculus LED screen and the media in the dome — SASCO Electric (single line).

ELAC South Gate Educational Center – This is a huge project where IBEW 11 has multiple contractors including Taft Electric, Baker Electric (Controls), First Fire (Low Voltage/FA), Teraband (Data-Comm), Elecnor Belco (Traffic). This project will continue until 2024.

Jefferson High School – ILB Electric is the IBEW 11 electrical contractor and First Fire (Sound & Comm). This project will continue until 2026 and will include new Buildings D, E, F and G, as well as alterations to Building A (A1, A2 and A3).

It is an honor to serve you as the business agent for District 1 South.

Shomari Davis
Business Representative District One South